Sunday 2nd February 2020 – The 2nd reed cut

The cleared area (almost 10,000 sq.m!)

The winter reed cuts at South Milton have always reminded me a bit of ‘Dad’s Army’, with a team of, not exclusively but largely, elderly volunteers and somewhat unreliable equipment. This impression was reinforced this morning when, after a night of heavy rain, the reserve manager gave a fantastic imitation of Private Frazer (you have to imagine a dour Scottish accent here!) – “We’re all doomed – nay body will turn up – the reeds will nay burn – you should have cancelled!”

These fears proved unfounded and 27 volunteers made short work of clearing the last of the area we started two weeks ago. It was damp underfoot but the reedbed remains alarmingly dry considering the rainfall we have received in the last few months. Around a hectare was cut in the end, fully meeting our stewardship obligations.

The repaired bank around the top end of Horswell sluice

I contributed very little on the day but concentrated on fixing a major leak beside the sluice on Horswell Ditch. Despite repairs by our contractor last autumn, the pressure of retained water had once gain punched a hole through the soil beside the sluice, partially draining the ditch. Vic and I managed to reduce the flow by jumping up and down on the earth above to compact it. I then spent the morning digging out and carrying shovel loads of clay to consolidate the bank, trying to build up a sufficiently robust buttress of soil upstream of the sluice. I finished off by topping the repair with turf in the hope that plant roots will help to reinforce and stabilise the bank.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s